The track plan are for my new boards, that I'm starting with , to make a small switching layout that can be attached to our NMRA-BR boards, at least on one side. One of the industries is a corn syrup unloading facility, based on the thread in 'industries' .
The boards are 18" x 3ft each, and the plan is currently based on Peco code 83 track with no 5 switches, to save space.
Here are the first two variations, comments appreciated as usual.
Koos

industrial Park V1B adjusted lead track by K2K Koos, on Flickr

industrial Park V1C crossing moved by K2K Koos, on Flickr