11th Avenue

Discussions on all modular specific topics...
Mike_R
Posts: 406
Joined: Fri Jul 03, 2009 7:05 pm

Re: 11th Avenue

Post by Mike_R »

The corner module, now named Causeway, is coming along.

First is the snow phase, when it all gets covered with ceiling paint. The track is protected by masking tape.

Image

It now stands on its own legs, a new method of single legs clamped in a socket has been used. If stable enough I might put these on other boards as they take up little room for transport.

Image

Finally a view of the causeway, with rocks now stained.

Image
Mike Ruby
Mike_R
Posts: 406
Joined: Fri Jul 03, 2009 7:05 pm

Re: 11th Avenue

Post by Mike_R »

Another day on Causeway's construction. This will probably be the last before Saturday's meeting. I'll see if I can get 11th Avenue's tower fitted tomorrow.

It now has static grass, FMR's small applicator and Woodland Scenics grass.

Image

I've fitted the culverts, 16mm flex conduit, one can be seen through.

Image

A potential photo opportunity. I really need to make a plain blue backscene to hang behind modules!

Image
Mike Ruby
User avatar
BrianMoore
Posts: 384
Joined: Fri Jul 03, 2009 7:05 pm
Location: Plymouth, UK

Re: 11th Avenue

Post by BrianMoore »

Looks great, Mike. 25 points awarded.
Brian Moore
PeterLJ
Posts: 151
Joined: Fri Jul 03, 2009 7:05 pm

Re: 11th Avenue

Post by PeterLJ »

Hi Mike

Looks great, remind me are we seeing it on Saturday?

Peter
Mike_R
Posts: 406
Joined: Fri Jul 03, 2009 7:05 pm

Re: 11th Avenue

Post by Mike_R »

PeterLJ wrote:Hi Mike

Looks great, remind me are we seeing it on Saturday?

Peter
Yes it will be at the meeting, we need it to turn Wolter Springs across the room. With both at the end of one route, they can be tested and debugged without affecting the rest of the layout. Hopefully they work first time and add to our operations.

Image
Mike Ruby
User avatar
Gloriousnse
Posts: 529
Joined: Tue Mar 15, 2011 5:32 pm
Location: Exeter, UK
Contact:

Re: 11th Avenue

Post by Gloriousnse »

Cool - see you guys tomorrow sometime! :)
Martyn Read
Mike_R
Posts: 406
Joined: Fri Jul 03, 2009 7:05 pm

Re: 11th Avenue

Post by Mike_R »

Just seen that Brian has got a video of the junction module on Model Railroader's site.

http://mrr.trains.com/videos/user-video ... m_content=
Mike Ruby
Mike_R
Posts: 406
Joined: Fri Jul 03, 2009 7:05 pm

Re: 11th Avenue

Post by Mike_R »

After working on the East end, now to changes at the other end. I'm shifting platform 3's track across to allow a full platform, it used to line up for the third track on the old modules.

The original view of the west end.
Image

The track has been removed, along with most of the upper level support columns.
Image

The new track in place.
Image

The new platform, cut from Sundeala, luckily I had an off cut from when I laid the originals over 10 years ago. Never throw anything away!
Image

The filler that I coated them with hasn't lasted, so I'll need to buy another tub.

A new board, probably the old 2' that used to fit on the end will be going on the end of the layout. Platforms 1 & 2 will terminate, only 3 will continue through to the end of the layout. This also makes the yard tracks longer and will make the module able to run as a through module.

Loco hauled trains pull into platform 3 and are the stock is then pulled out and placed into 1 or 2.
Mike Ruby
User avatar
torikoos
Posts: 876
Joined: Mon Nov 09, 2009 10:46 pm
Location: Newton Abbot, Devon, UK .
Contact:

Re: 11th Avenue

Post by torikoos »

You are moving along steadily Mike, only just heard about your intentions last meet, and action is already in full swing. Looking forward how it goes on from here.

Koos


Sent from my iPhone using Tapatalk
Koos Fockens -Devon UK. North American Model Railroading
Age is just a case of mind over matter. If you don't mind, then it doesn't matter.
Mike_R
Posts: 406
Joined: Fri Jul 03, 2009 7:05 pm

Re: 11th Avenue

Post by Mike_R »

More work has been done to the new station. One of my old 2' boards built for the old three track standard, which used to fit on the end of this module, saving a lot of work. I removed the three old tracks, the yard tracks remain, just straightened.

Image

The new platform three track, which will allow 11th Avenue to become a through module was installed followed by new platforms and a base for the station, a mockup of which can be seen at left.

Image

The card foundations for the building are now in, the tracks are covered to allow a fine filler to be spread on the platforms. 2mm acrylic sheet forms the street at the right edge.

Image
Mike Ruby
Mike_R
Posts: 406
Joined: Fri Jul 03, 2009 7:05 pm

Re: 11th Avenue

Post by Mike_R »

11th Avenue's platforms are now finished, and I've ballasted the tracks. The photos show the card mockup of the Walthers kit that will go here.

The front of the station.

Image

The rear with the longest platform, no3 for arrivals.

Image
Mike Ruby
User avatar
BrianMoore
Posts: 384
Joined: Fri Jul 03, 2009 7:05 pm
Location: Plymouth, UK

Re: 11th Avenue

Post by BrianMoore »

Looks great, Mike. How long is platform 3? Just musing on whether it could take the arrival of an Amtrak terminating train that could be switched and turned around to go back to staging.
Brian Moore
Mike_R
Posts: 406
Joined: Fri Jul 03, 2009 7:05 pm

Re: 11th Avenue

Post by Mike_R »

Platform 3 is 6' long, 1 & 2 4' long.
The idea is a loco hauled train would pull into 3. The stock would then be pulled back and placed in 1 or 2. The locos can then run back to the loco spur or on to the train for departure. Platform 1 has 2' of clear track beyond the platform so can hold that 6' train for departure. If you don't mind stock being off the platform the train limit is around 8', but would block platform 2 on arrival. Platform 1 could take that train without blocking the furthest crossover.
How long is your train?
Mike Ruby
Mike_R
Posts: 406
Joined: Fri Jul 03, 2009 7:05 pm

Re: 11th Avenue

Post by Mike_R »

Another thought the train locos can run around 6' of stock, using the freight yard. They can then either push back into platform 1,2 or 3.
Mike Ruby
User avatar
torikoos
Posts: 876
Joined: Mon Nov 09, 2009 10:46 pm
Location: Newton Abbot, Devon, UK .
Contact:

Re: 11th Avenue

Post by torikoos »

I think I'm seeing where this is going :-)
Nothing to do with two F40PH loco's pulling a certain train Brian? ;)

One and two would be great for push pull services, such as the Metro sets we had at Broadclyst, or SP commuter trains, with Bi-level coaches and a passenger GP9 ;)

Koos
Koos Fockens -Devon UK. North American Model Railroading
Age is just a case of mind over matter. If you don't mind, then it doesn't matter.
Post Reply