Mike,
This is certainly what I would like to get involved with but not sure where to start... any suggestions?
I do not have access to a home layout and don't know of any layouts close by that I could operate on?
H E L P ???
Peter
Search found 120 matches
- Wed Apr 29, 2015 2:53 pm
- Forum: Operations
- Topic: Achievement Programme - Chief Dispatcher
- Replies: 8
- Views: 26149
- Mon Apr 27, 2015 1:54 pm
- Forum: Operations
- Topic: Achievement Programme - Chief Dispatcher
- Replies: 8
- Views: 26149
Re: Achievement Programme - Chief Dispatcher
Gents,
I am very interested in pursuing this and want to know where to start and who wants an extra operator on their layout.
Any help and suggestions are more than welcome please.
Peter
I am very interested in pursuing this and want to know where to start and who wants an extra operator on their layout.
Any help and suggestions are more than welcome please.
Peter
- Tue Mar 03, 2015 11:57 am
- Forum: Competitions & Challenges
- Topic: Build a xxxx challenges, lessons learnt
- Replies: 3
- Views: 17618
Re: Build a xxxx challenges, lessons learnt
I really enjoyed the building challenge and it was an effort to get it all done before and after Christmas - it is amazing how time flies when other things creep into the available time one has for modelling. My personal challenge was that I had to have it all complete prior to going on a train holi...
- Fri Feb 20, 2015 9:41 pm
- Forum: Buildings and Scenery
- Topic: Build a Structure - Peter Bowen - RGS Timber Trestle
- Replies: 26
- Views: 83244
Re: Build a Structure - Peter Bowen - RGS Timber Trestle
F I N I S H E D The Rio Grande Southern style Trestle is complete...!!! Rio Grande Southern Goose No. 4 a Precision Scale ON30 model with sound creeps across the finished Trestle after the Track Gang have ensured the gauge is perfectly aligned and ready to receive traffic. http://www.drgwrr.co.uk/wp...
- Fri Feb 20, 2015 11:43 am
- Forum: Buildings and Scenery
- Topic: Build a Structure - Peter Bowen - RGS Timber Trestle
- Replies: 26
- Views: 83244
Re: Build a Structure - Peter Bowen - RGS Timber Trestle
The code 70 rail has now been attached as previously described using the Pliobond adhesive method: http://www.drgwrr.co.uk/wp-content/uploads/2015/02/IMG_6577-1024x768.jpg The guard rail timbers have also been attached: http://www.drgwrr.co.uk/wp-content/uploads/2015/02/IMG_0224-1024x768.jpg http://...
- Mon Feb 16, 2015 9:25 pm
- Forum: Buildings and Scenery
- Topic: Build a Structure - Peter Bowen - RGS Timber Trestle
- Replies: 26
- Views: 83244
Re: Build a Structure - Peter Bowen - RGS Timber Trestle
Completing the Bracing
As the trestle nears completion the final cross bracing is added to ensure the structure is strong and stable.
As the trestle nears completion the final cross bracing is added to ensure the structure is strong and stable.
- Sun Feb 15, 2015 8:34 pm
- Forum: Buildings and Scenery
- Topic: Build a Structure - Peter Bowen - RGS Timber Trestle
- Replies: 26
- Views: 83244
Re: Build a Structure - Peter Bowen - RGS Timber Trestle
Adding Horizontal Bracing "Girts" Construction is nearing completion as the horizontal bracing "girts" are added to the structure to provide strength to the vertical bents as this forms amazing rigidity to the overall structure. Threading the 32 ft long 8" x 8" long ti...
- Sat Feb 14, 2015 6:36 pm
- Forum: Buildings and Scenery
- Topic: Build a Structure - Peter Bowen - RGS Timber Trestle
- Replies: 26
- Views: 83244
Re: Build a Structure - Peter Bowen - RGS Timber Trestle
Attaching Trestle Bents to the Splined Bridge Deck I have been struggling with attaching the Trestle Bents to the Splined Bridge Deck trying to keep them square to the deck and upright at the same time. I created a styrene jig to hold them in place but this failed as I tried to apply sufficient wei...
- Fri Feb 13, 2015 10:25 am
- Forum: Buildings and Scenery
- Topic: Build a Structure - Peter Bowen - RGS Timber Trestle
- Replies: 26
- Views: 83244
Re: Build a Structure - Peter Bowen - RGS Timber Trestle
Trestle Abutment Detail At the ends of the trestle there would have been abutments to hold back roadbed fill. These abutments consist of a trestle bent with scale 3" x 18" timber boards which would have been nailed through the back before being backfilled. The iregular shape is due to exi...
- Tue Feb 10, 2015 9:48 pm
- Forum: Buildings and Scenery
- Topic: Build a Structure - Peter Bowen - RGS Timber Trestle
- Replies: 26
- Views: 83244
Re: Build a Structure - Peter Bowen - RGS Timber Trestle
Hand Laid Rail Spiking Update Construction progress has been slow over the last several weeks due to my new role as Renewals Officer for the British Region NMRA. It is quite a daunting task but I have had great support from John Firth and I am beginning to get the hang of it...! I revisited the &qu...
- Wed Feb 04, 2015 11:54 am
- Forum: Buildings and Scenery
- Topic: Build A Structure - John Lewis - White Metal Gas Station
- Replies: 8
- Views: 35174
Re: Build A Structure - John Lewis - White Metal Gas Station
John,
Welcome to the challenge - looking forward to seeing your progress on this unusual model.
Welcome to the challenge - looking forward to seeing your progress on this unusual model.
- Mon Jan 26, 2015 7:10 pm
- Forum: Buildings and Scenery
- Topic: Build a Structure - Peter Bowen - RGS Timber Trestle
- Replies: 26
- Views: 83244
Re: Build a Structure - Peter Bowen - RGS Timber Trestle
Problem with Rail Spikes Construction progress was halted recently as the rail spikes refused to hold the rail securely to the ties. Pre-drilling an undersize hole for the spike to prevent splitting seemed to work but there was not enough grip to hold the rail. In the past I have used Shinohara cod...
- Fri Jan 16, 2015 8:11 pm
- Forum: Buildings and Scenery
- Topic: Build a Structure - Peter Bowen - RGS Timber Trestle
- Replies: 26
- Views: 83244
Re: Build a Structure - Peter Bowen - RGS Timber Trestle
Applying Rail to the Splined Trestle Deck The splined trestle deck is now complete with ties and before assembling this to the trestle bents it is time to spike the rail on to the ties. The RGS typically used rail length of 30 feet. I used weathered Micro Engineering code 70 rail cut to scale 30ft ...
- Thu Jan 08, 2015 7:43 pm
- Forum: Buildings and Scenery
- Topic: Build a Structure - Peter Bowen - RGS Timber Trestle
- Replies: 26
- Views: 83244
Re: Build a Structure - Peter Bowen - RGS Timber Trestle
Ties and Trestle Deck The splined trestle deck is completed with the placement of the 8" x 8" x 10' pre-stained ties. http://www.drgwrr.co.uk/wp-content/uploads/2015/01/IMG_0037-1024x768.jpg http://www.drgwrr.co.uk/wp-content/uploads/2015/01/IMG_0036-1024x768.jpg Clamps and more clamps - ...
- Tue Jan 06, 2015 7:17 pm
- Forum: Buildings and Scenery
- Topic: Build a Structure - Peter Bowen - RGS Timber Trestle
- Replies: 26
- Views: 83244
Re: Build a Structure - Peter Bowen - RGS Timber Trestle
Adding Ties to Stringers Finished splined stringers with temporary longitudinal spacer inserted to hold the stringers apart ready to accept the ties. http://www.drgwrr.co.uk/wp-content/uploads/2015/01/2014-12-31-17.55.47-1024x768.jpg http://www.drgwrr.co.uk/wp-content/uploads/2015/01/2014-12-31-18....